Chrome Extension
WeChat Mini Program
Use on ChatGLM

Probing Sram Signals For Yield Management

2019 IEEE 26TH INTERNATIONAL SYMPOSIUM ON PHYSICAL AND FAILURE ANALYSIS OF INTEGRATED CIRCUITS (IPFA)(2019)

Cited 1|Views43
No score
Abstract
Probing is increasingly utilized for characterization of local electrical properties of ICs, as well as for defect isolation. Test structures and/or SRAM arrays were examined with various probing modes, i.e. Electron Beam Induced Current (EBIC), both one and two probe Electron Beam Absorbed Current (EBAC), and EBIRCH (Electron Beam Induced Resistance CHange). The results demonstrate the value of using each for SRAM yield management. EBIC provides for imaging of depletion zones between p-wells and n-wells, even in a planar view. EBAC can provide information on basic connectivity as well as enabling isolation of resistive areas along a conductor. EBIRCH, being driven by two different mechanisms (thermal coefficient of resistivity and Seebeck effect) can provide two different analysis types, depending on conditions. EBIRCH not only precisely isolated the fin responsible for a short, but also highlighted the thermal relations between the elements of a pulldown device in an SRAM. These techniques together provide multiple forms of process feedback in an integrated yield management program involving analysis of via chains, SRAM parallel array test structures, and SRAMs.
More
Translated text
Key words
SRAM yield management,EBIC,depletion zones,p-wells,n-wells,EBAC,resistive areas,EBIRCH,integrated yield management program,SRAM parallel array test structures,defect isolation,SRAM arrays,probing modes,electron beam induced current,electron beam absorbed current,electron beam induced resistance change,SRAM signal probing,local electrical properties,thermal coefficient of resistivity,Seebeck effect,pulldown device
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined