ITER NBI Operational Window and Power Availability Constraints Due to Shine-Through LossesP. Vincenzi, M. Schneider, P. Veltri,J. F. Artaud,A. Loarte, S. Nicolici, C. Poggi,A. R. Polevoi,A. SnickerNUCLEAR FUSION(2025)引用 0|浏览2关键词ITER,NBI,shine-through,power load,auxiliary power,H&CDAI 理解论文溯源树样例生成溯源树,研究论文发展脉络Chat Paper正在生成论文摘要