Optimization Design of Casting Process for Large Long Lead Cylinder of Aluminum Alloy
Materials (Basel, Switzerland)(2025)
关键词
aluminum alloy large long lead cylinder,low pressure casting,numerical simulation,response surface method
AI 理解论文
溯源树
样例

生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要