Integrated Scheduling of Production and Material Delivery for the Intelligent Manufacturing System
International Journal of Production Research(2024)
Key words
Flexible flowlines,limited delivery capacity,integrated scheduling,bi-level algorithm,neighbourhood search
AI Read Science
Must-Reading Tree
Example

Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined