LHC Upgrades in preparation of Run 3

Journal of Instrumentation(2024)

Cited 0|Views5
No score
Abstract
Abstract The Large Hadron Collider (LHC) Long Shutdown 2 (2019–2021), following LHC Run 2, was primarily dedicated to the upgrade of the LHC Injectors but it included also a significant amount of activities aimed at consolidation of the LHC machine components, removal of known limitations and initial upgrades in view of the High-Luminosity LHC (HL-LHC) to favour the intensity ramp-up during Run 3 (2022–2025). An overview of the major modifications to the accelerator and its systems is followed by a summary of the results of the superconducting magnet training campaign to increase the LHC operation energy beyond the maximum value of 6.5 TeV reached during Run 2. The LHC configuration and the scenarios for proton and ion operation for Run 3 are presented considering the expected performance of the upgraded LHC Injectors and the proton beam intensity limitations resulting from the heat load on the cryogenic system due to beam-induced electron cloud and impedance.
More
Translated text
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined