Development of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method

Khalid K. Naji,Murat Gunduz, Manal M. Mansour

Journal of Construction Engineering and Management(2024)

引用 0|浏览0
暂无评分
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要