A heuristic approach to minimizing the waiting time of jobs in two-stage flow shop scheduling

Bharat Goyal, Sukhmandeep Kaur,Deepak Gupta

OPERATIONS RESEARCH AND DECISIONS(2024)

引用 0|浏览0
暂无评分
摘要
The paper presents the influence of the waiting time of jobs in a 2 machine k -job Flow Shop Scheduling (FSS) problem. The main intention of the study is to find a sequence of jobs that delivers the least sum of the time of waiting for jobs. A heuristic approach has been adopted to achieve the desired objective. The experiments are conducted for more than 2000 problems of various sizes for the problems with special structures and problems with random times of processing. The weighted mean absolute error (WMAE) for the average of the sum of the waiting times of jobs is computed for both kind of problems after comparing with the optimal solutions. WMAE has been obtained less than 0.0075 for problems with special structures and less than 0.087 for problems with random times of processing. The WMAE is also reducing significantly with the increase in job size. The results demonstrate that the presented step-by-step procedure of the heuristic delivers significantly close to optimal solutions.
更多
查看译文
关键词
special structures,FSS,waiting time,processing time,heuristic
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要