Modeling of Intermittent Commutation Control of Static Frequency Converter of Pumped Storage Unit Based on PSCAD

Jian Zhou, Yuxin Li, Xin Zhang,Dahai Zhang

2023 4th International Conference on Advanced Electrical and Energy Systems (AEES)(2023)

引用 0|浏览1
暂无评分
摘要
Static variable frequency starting is the main way to start large synchronous units in pumped storage power stations, which has the advantages of stable starting process and fast response speed. Static Frequency Converter (SFC) has become an important part of the frequency conversion start-up of the pumping and storage unit. The establishment of electromagnetic transient simulation model is an important basis for the study of dynamic response characteristics such as static variable frequency start-up fault characteristics and protection methods of pumping and storage units. However, most of the existing researches on the control strategy and simulation model for the conversion start-up of the pumping and storage unit focus on the natural commutation process, and the simulation of the intermittent commutation stage cannot be well realized. Moreover, there is no literature on the PSCAD simulation platform to build the simulation model of the static inverter of the pumping and storage unit. In this paper, the control principle of static variable frequency start intermittent circulation process of pumped storage power station is fully studied, the rotor starting Angle is defined, and the corresponding thyristor converter valve triggering sequence under different motor rotor positions is calculated. Based on the PSCAD simulation platform, a static variable frequency start-up model of the pumping and storage unit is built, and a subroutine module is written in C language to interact with PSCAD to realize thyristor trigger conduction in the intermittent commutation stage. The simulation verifies the correctness and effectiveness of the established model.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要