Renal Metabolomics Study and Critical Pathway Validation of Shenkang Injection in the Treatment of Chronic Renal Failure
BIOLOGICAL & PHARMACEUTICAL BULLETIN(2024)
摘要
To reveal the mechanism of Shenkang injection (SKI) in the treatment of chronic renal failure, and verify the key pathway. In this work, an untargeted metabolomics approach was performed by LC -MS coupled with multivariate statistical analysis to provide new insights into therapeutic mechanism of SKI. Hematoxylin-eosin (H&E) Staining and Immunohistochemistry were used to evaluate the effects of drug treatment, Western blot was used to verify the critical pathway. Then, a total of 44 potential biomarkers of chronic renal failure (CRF) were identified and reversed regulation, including 2,8-dihydroxypurine, 5-methoxytryptophan, uric acid, acetylcarnitine, taurine, etc. Mainly concerned with arginine and proline metabolism, purine metabolism, histidine metabolism, etc. Pathological examination showed that the renal interstitium of SKI group was significantly improved, with fewer inflammatory cells and thinner vascular walls compared with the model group. Immunohistochemical results showed that the expression of alpha-smooth muscle actin (alpha-SMA) was decreased, and the expression of E-cadherin was increased in CRF model group, and the two indicators were reversed regulation in SKI injection, indicating that the degree of fibrosis was relieved. Critical signaling pathway phosphatidylinositol 3-kinase (PI3K)/protein kinase B (Akt) and nuclear factor-kappaB (NF-kappa B) protein expressions were significantly inhibited. This study was the first to employ metabolomics to elucidate the underlying mechanisms of SKI in chronic renal failure. The results would provide some support for clinical application of traditional Chinese medicines in clinic.
更多查看译文
关键词
renal,metabolomics,Shenkang injection,chronic renal failure
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要