No idle flow shop scheduling models with separated set-up times and concept of job weightage to optimize rental cost of machines

JOURNAL OF PROJECT MANAGEMENT(2024)

引用 0|浏览0
暂无评分
摘要
The current paper investigates a two-stage flow shop scheduling model with no idle restriction, in which the time taken by machines to set-up is separately considered from the processing time. Owing to inherent usefulness as well as relevance in real-world situations, jobs' weight has additionally included. To eliminate machine idle time and cutting machine cost of rental, the reason for the conduct of the study is to provide a heuristic algorithm which, once put into practice, processes jobs in an optimal way, guarantees in smallest conceivable make span. Multiple computational examples generated in MATLAB 2019a serve as testament to the efficacy of the proposed strategy. The outcomes are contrasted with the current methods that Johnson, Palmer and NEH have demonstrated. (c) 2024 Growing Science Ltd. All rights reserved.
更多
查看译文
关键词
Flowshop,Set-up time,No idle,Sequence,Scheduling,Weightage
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要