Fixed-Time Impact Time Control Guidance Law for Missiles With Input Saturation Constraints Against Maneuvering Targets
2023 38th Youth Academic Annual Conference of Chinese Association of Automation (YAC)(2023)
摘要
This paper is concerned with the fixed-time impact time control guidance (ITCG) problem against maneuvering targets. Firstly, the fixed-time observers are adopted to estimate the maneuvering target’s unknown acceleration. Then, a fixed-time ITCG law is derived by resorting to the time-to-go of deviated pursuit guidance, where the unknown target acceleration is compensated based on the estimates obtained from the fixed-time observers. Moreover, an auxiliary system is adopted to tackle the frequently encountered input saturation constraints, and the fixed-time stability of the proposed ITCG law is analyzed. Finally, simulation results are provided to demonstrate the designed ITCG law.
更多查看译文
关键词
Impact time control guidance,fixed-time control,maneuvering targets,input saturation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要