Resource Leveling of an Artificial Lake Construction Project with a Risk-Aware Approach

Springer proceedings in business and economics(2023)

引用 0|浏览2
暂无评分
摘要
This work examines risk factors that affect the duration of activities and the overall project timeline. Initially, statistical distributions are used to express the uncertainty of project time completion, and then, Monte Carlo Simulation is used to estimate the actual level of risk that each activity and the total project are exposed to. Next, we used the computed level of risk to construct a list of activities sorted by ascending risk level—this activities’ list was used as the priority list while performing the resource leveling process. The basic contribution of this study is the introduction of an approach that uses the level of risk to prioritize each activity during the assignment of constrained resources while minimizing resource usage fluctuations. The proposed approach is applied to estimate the impact of the risks to the total project duration of an artificial lake construction project and level constrained resources with respect to the activities’ risks.
更多
查看译文
关键词
artificial lake construction project,risk-aware
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要