Lot Streaming in Hybrid Flow Shop Manufacturing Systems

Lecture notes in logistics(2023)

引用 0|浏览4
暂无评分
摘要
In traditional machine scheduling, the focus is on determining the sequence of jobs on the machines. Meanwhile, the logistical question of how to organize the transport process between production stages frequently remains in the background. In this article, however, we consider lot streaming, offering the possibility to forward units to the next production stage before the entire production lot has been completed. Specifically, we analyze lot streaming in a hybrid flow shop where the aim is to minimize the makespan. For this purpose, two mixed-integer optimization models are developed and compared with respect to their solution quality. Based on the superior formulation, we analyze the influence of the configuration of the hybrid flow shop in terms of the number of production stages, the number of machines on the stages, and the length of the processing times on the makespan for moderate problem sizes. The results obtained highlight the importance and effect of different lot streaming scenarios in scheduling, and, in particular when the increased complexity of scheduling with sublots is worthwhile.
更多
查看译文
关键词
flow,manufacturing,hybrid
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要