How to Prioritize Replenishment Orders in Demand Driven MRP: A Simulation Study

Lecture notes in mechanical engineering(2023)

引用 0|浏览4
暂无评分
摘要
Demand Driven Material Requirements Planning (DDMRP) assumes that a production order is generated for replenishment when the inventory position, given by the net flow equation, is below a given level. Literature on this production planning and control system suggests prioritizing open orders on the shop floor based on the inventory buffer status. However, the performance of buffer-oriented priority dispatching largely remains unknown. Using discrete event simulation, this study suggests that buffer-oriented dispatching based on the net flow equation outperforms due date-oriented dispatching rules and first-come-first-served. The performance impact depends, however, on the reorder quantity associated with the production orders. These results have important implications for industrial practice.
更多
查看译文
关键词
replenishment orders,demand,mrp
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要