Historical information based iterated greedy algorithm for distributed flowshop group scheduling problem with sequence-dependent setup times

OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE(2024)

引用 1|浏览7
暂无评分
摘要
Distributed flowshop group scheduling problem (DFGSP) is commonly seen in modern industry. However, research works on DFGSP with total flow time criterion are rarely reported. The DFGSP consists of three coupled sub-problems, i.e., factory assignment for each group, group sequence in each factory, and job sequence within each group. A historical information-based iterated greedy algorithm (HIG) is proposed for solving the DFGSP with the objective of minimizing total flow time. The HIG integrates an iterated greedy algorithm (IG) with a group-based insertion operator, a job-based insertion operator, a domination criterion-based swap operator, and a historical information-based constructive solution method. The domination criterion is an effective inequality, which can deterministically optimize the objective value of a partial sequence even if the scheduling sequence of subsequent jobs is unknown. In the constructive solution method, a set covering model is designed to capture the effective factory allocation patterns for the groups hidden in the historical solutions to speed up the search for the IG. The comprehensive experiments on 810 test instances demonstrate the effectiveness of HIG.
更多
查看译文
关键词
Distributed flowshop,Group scheduling,Total flow time,Iterated greedy,Domination criterion,Historical information
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要