Buffer Times Between Scheduled Events in Resource Assignment Problem: A Conflict-Robust Perspective

M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT(2023)

引用 0|浏览13
暂无评分
摘要
Problem definition: In many resource scheduling problems for services with scheduled starting and completion times (e.g., airport gate assignment), a common approach is to maintain appropriate buffer between successive services assigned to a common resource. With a large buffer, the chances of a "crossing" (i.e., a flight arriving later than the succeeding one at the gate) will be significantly reduced. This approach is often preferred over more sophisticated stochastic mixed-integer programming methods that track the arrival of all the flights to infer the number of "conflicts" (i.e., a flight arriving at a time when the assigned gate becomes unavailable). We provide a theoretical explanation, from the perspective of robust optimization for the good performance of the buffering approach in minimizing not only the number of crossings but also the number of conflicts in the operations. Methodology/results: We show that the buffering method inherently minimizes the worst-case number of "conflicts" under both robust and distributionally robust optimization models using down-monotone uncertainty sets. Interestingly, under down-monotone properties, the worst-case number of crossings is identical to the worstcase number of conflicts. Using this equivalence, we demonstrate how feature information from flight and historical delay information can be used to enhance the effectiveness of the cation on the use of buffering method to control for the number of conflicts in resource assignment problem.
更多
查看译文
关键词
scheduled events,resource assignment problem,buffer times,conflict-robust
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要