Towards a transmission control mechanism for data centres based on flow deadline and size over software defined networking.

Int. J. Internet Protoc. Technol.(2023)

引用 0|浏览2
暂无评分
摘要
Data centres (DCN) support lots of online services, which possess strict deadline constraints. Some research shows that TCP protocol cannot provide deadline-aware transmission services for intra-DCN traffic, because TCP protocol cannot learn about upper application information and always fairly allocate bottleneck bandwidth. As a result, those throughput-sensitive flows have bigger sending windows, yet deadline-aware flows have to queue for forwarding along with longer delays. To address the issue above, we present DSATC, a transmission control mechanism based on flow deadline and size. DSATC uses double ECN thresholds to mark packets, takes the remaining completion time and size of a flow to calculate the flow urgency and redefines the adjustment method of the congestion window (CWND) to balance congestion control and flow deadline completion rate. The experimental results show that DSATC not only efficiently raises flow deadline completion rate and reduces flow completion time but also lifts network throughput.
更多
查看译文
关键词
data centres,flow deadline,transmission control mechanism
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要