Three-dimensional predefined-time impact angle control guidance law with field-of-view limit.
J. Frankl. Inst.(2023)
摘要
In this paper, an impact angle control guidance (IACG) law with predefined convergence time and seeker's field-of-view (FOV) limit is proposed in three-dimensional (3D) scenario. First, a predefined -time error dynamic is developed whose significance is revealed by comparison with conventional meth-ods. Second, based on coupled engagement dynamics, a 3D predefined-time IACG law is derived by applying the proposed error dynamic. To tackle the FOV limit, two auxiliary functions are introduced into the IACG law. The robustness against disturbances and uncertainties is further improved by utiliz-ing the terminal sliding mode technique. With the proposed guidance law, the impact-angle error can converge to zero exactly at a tunable predefined time. Finally, the effectiveness and performance of the proposed IACG law are shown by several simulations with comparative study.& COPY; 2023 The Franklin Institute. Published by Elsevier Inc. All rights reserved.
更多查看译文
关键词
angle,three-dimensional,predefined-time,field-of-view
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要