Experimental and Numerical Investigation into Full-Scale Model of New Type Assembled Integral Utility Tunnel

Jichao Zhang,Yan Zhang, Chaoheng Peng, Youkun Lei,Aijun Zhang, Zhengxuan Zuo,Zeyu Chen

BUILDINGS(2023)

引用 0|浏览2
暂无评分
摘要
This article summarizes the current construction methods of prefabricated utility tunnels. (1) The proposed cast-in-place utility tunnel project was used as a background for this study. (2) The original cast-in-place structure was divided into components, and the connection methods of prefabricated composite slabs and mortise and tenon joints were used to propose a new type of prefabricated concrete utility tunnel construction method. After completing the design of the new prefabricated utility tunnel, a numerical simulation analysis of the actual stress situation of the utility tunnel was carried out using ABAQUS finite element software to verify the overall structural performance of the assembled utility tunnel. In addition, after completing the construction of the full-size model of the dual chamber, static load tests were carried out. (3) The test used the method of monotonic static bidirectional loading with a central hydraulic jack and tensioned steel strands, analyzed the cracks, deformation curves, and stress-strain of steel bars and concrete of the overall structure of the utility tunnel, and (4) verified the feasibility of the new assembled integral utility tunnel.
更多
查看译文
关键词
urban underground utility tunnel, assembly integral, full-scale model, mechanical loading test, mechanical behavior
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要