Integrating BIM and Multiple Construction Monitoring Technologies for Acquisition of Project Status Information

Saed Hasan,Rafael Sacks

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT(2023)

引用 0|浏览1
暂无评分
摘要
Although novel construction tech systems have been developed to monitor construction sites, each collects data in isolation. We present an event processing model (EPM) that applies multiple monitoring technologies in parallel and a set of algorithms to interpret data from the multiple streams for operations control. In a full-scale lab experiment, multiple monitoring systems were applied to monitor workers as they built drywall partitions with a variety of systems and finishes. Data from the different streams were merged to establish what work was done, by whom, where, and for how long. The results suggest that collecting, merging, and interpreting diverse data streams using a multiple monitoring technologies system on-site can provide more complete and more accurate project status information than can be obtained from the use of any individual technology. This is essential for the automation of project progress monitoring, which is important in automating production planning and control tasks.
更多
查看译文
关键词
multiple construction monitoring technologies,project status information,bim
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要