The effects of performance measurement on megaproject performance: the moderating effects of project complexity

Wensheng Lin,Guangbin Wang,Yan Ning,Qiuwen Ma, Shuyuan Dai

ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT(2023)

引用 0|浏览0
暂无评分
摘要
PurposeMegaproject performance measurement (MPM) has received great attention in the project management community, but it primarily focused on the design of performance measures or frameworks. Yet, whether MPM utilization can improve megaproject performance and how project actors use MPM to improve megaproject performance is less well understood. This study aims to investigate whether and how the use of MPM can contribute to better megaproject performance.Design/methodology/approachThrough the lens of the lever of control, this study conceptualizes MPM utilization as diagnostic use and interactive use. A holistic research model and related hypotheses integrating MPM use, project complexity and megaproject performance were established. The model was validated using a partial square-structural equation modeling method.FindingsBased on 214-megaproject data collected through a questionnaire survey in China, the results show positive effects of diagnostic use and interactive use on megaproject performance. Both, however, have substitutional interaction effects. The moderating results suggest that the higher project complexity weakens the positive effects of MPM utilization on megaproject performance.Originality/valueThis study advances megaprojects performance measurement and management literature by validating the value of MPM utilization on performance. It also presents practical implications for project managers to improve performance by appropriate MPM utilization.
更多
查看译文
关键词
Megaproject performance measurement (MPM), The lever of control, Diagnostic use, Interactive use, Project complexity, Megaproject performance
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要