Bi-objective optimization of the scheduling of risk-related resources for risk response.

Reliab. Eng. Syst. Saf.(2023)

引用 0|浏览1
暂无评分
摘要
•Optimizing the allocation and scheduling of risk-related resources.•Tailoring a rule-based metaheuristic algorithm to the optimization model.•Tradeoffs between prevention and mitigation resources.•Validating the performance of the proposed algorithm through comparisons.
更多
查看译文
关键词
Project risk management, Risk -related resource, Project scheduling, Meta -heuristic algorithms, Bi-objective optimization