A late-mover genetic algorithm for resource-constrained project-scheduling problems.

Inf. Sci.(2023)

引用 2|浏览7
暂无评分
摘要
The Resource-Constrained Project Scheduling Problem (RCPSP) plays a critical role in various management applications. Despite its importance, research efforts are still ongoing to improve lower bounds and reduce deviation values. This study aims to develop an innovative and straightforward algorithm for RCPSPs by integrating the “1+1” evolution strategy into a genetic algorithm framework. Unlike most existing studies, the proposed algorithm eliminates the need for parameter tuning and utilizes real-valued numbers and path representation as chromosomes. Consequently, it does not require priority rules to construct a feasible schedule. The algorithm's performance is evaluated using the RCPSP benchmark and compared to alternative algorithms, such as cWSA, Hybrid PSO, and EESHHO. The experimental results demonstrate that the proposed algorithm is competitive, while the exploration capability remains a challenge for further investigation.
更多
查看译文
关键词
genetic algorithm,late-mover,resource-constrained,project-scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要