Current status of ECE system on EAST tokamak

EPJ Web of Conferences(2023)

引用 0|浏览36
暂无评分
摘要
The electron cyclotron emission (ECE) diagnostic on the experimental advanced superconducting tokamak (EAST) has had a major upgrade since 2020, when EAST heating system also went through a significant upgrade, including one NBI system changed from counter-current to co-current (moving from port F to port D), and the antenna and the installation port of LHW and ICRF system have also been changed. The quasi-optical (QO) antenna of P port ECE system has been redesigned, the main purpose of which is to add one oblique ECE view. The angle with respect to perpendicular to the magnetic field is about 10°, which will facillitate measurement of the electron velocity distribution altered by LHW system. The ellipsoidal mirror has also been moved close to the plasma, about 70 cm away from the plasma center, and the poloidal beam waist radius in the plasma has been optimised to be less than 3 cm. The CECE system has also been moved from port G to port C. The frequency coverage of the CECE system has been upgraded to 104-132 GHz by adding one radio frequency (RF) module. Also in the intermediate frequency (IF) module, 8 narrow-band filters have been added to improve the spacial coverage of the system. On port F, a new superheterodyne radiometer with narrow-band filters in IF module has been installed. It consists of eight channels, the radial coverage is about 8 cm, the main purpose of this new system is to study the fine structure of magnetic island.
更多
查看译文
关键词
east tokamak,ece system
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要