Chrome Extension
WeChat Mini Program
Use on ChatGLM

Research on Very Fast Transient Voltage of 330kV GIS Disconnector Operation

2023 5th Asia Energy and Electrical Engineering Symposium (AEEES)(2023)

Cited 0|Views10
No score
Abstract
With the increase of voltage level, the very fast transient overvoltage generated during the switching operation of GIS disconnector is an important factor threatening the safe and stable of secondary equipment. Based on the test data of 330 kV GIS disconnector switching operation, this paper extracts the characteristic of macropulse waveform and monopulse waveforms of the load side transformer and bushing, and makes a comprehensive statistical analysis of the transient waveform characteristic data. The results show that the duration of single breakdown of VFTO is generally more than ten microseconds, the time interval between breakdowns is ms level, the rise time is basically distributed in 0.1 ~ 9μs, and the VFTO dominant frequency is distributed in 1.9MHz, 20MHz and 6MHz respectively.
More
Translated text
Key words
GIS isolating switch,VFTO,test,waveform parameters,statistical analysis
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined