Coupled hydro-mechanical analysis for water inrush of fractured rock masses using the discontinuous deformation analysis

COMPUTERS AND GEOTECHNICS(2023)

引用 3|浏览8
暂无评分
摘要
Water inrush is one of the most frequent geohazards during tunnel or mining excavation, and the study of the water-resisting stratum is of great significance in mitigating and preventing this disaster. Aiming at the fractured water-resisting rock mass ahead of the tunnel face, the discontinuous deformation analysis (DDA) coupled hydro -mechanical method was adopted to shed light on the failure process of the water-resisting stratum. The coupled method was implemented, including introducing single fracture flow equations, assembling the global conduc-tivity equation, coupling seepage force, and updating the discrete fracture network. Then, after validating the coupled method by comparing the numerical results with theoretical solutions and experimental measurements, a real inrush case of Yonglian tunnel in a water-rich fault fracture zone was simulated to study the influence of the thickness of the water-resisting structure, stratum stress, and seepage force on the evolution characteristic of the geohazard. The simulation results could well depict the failure mechanism of the water-resisting structure, and the obtained results considering the progressive damage were more correspond to practice than those based on continuous assumption, showing the capacity of the coupled method for studying practical engineering geohazards.
更多
查看译文
关键词
Coupled hydro-mechanical model,Discontinuous deformation analysis,Water inrush,Fractured rock
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要