Lifetime impact of achondroplasia study in Europe (LIAISE): findings from a multinational observational study
Orphanet journal of rare diseases(2023)
摘要
Background Achondroplasia, caused by a pathogenic variant in the fibroblast growth factor receptor 3 gene, is the most common skeletal dysplasia. The Lifetime Impact of Achondroplasia Study in Europe (LIAISE; NCT03449368) aimed to quantify the burden of achondroplasia among individuals across a broad range of ages, including adults. Methods Demographic, clinical and healthcare resource use data were collected from medical records of achondroplasia patients enrolled in 13 sites across six European countries in this retrospective, observational study. Descriptive statistics or event rates per 100 person-years were calculated and compared across age groups as well as by history of limb lengthening. Patient-reported outcomes (quality of life [QoL], pain, functional independence, work productivity and activity impairments) were evaluated using questionnaires at the time of enrolment. An exploratory analysis investigated correlations between height (z-score or centimetres) and patient-reported outcomes. Results Overall, 186 study patients were included, with a mean age of 21.7 ± 17.3 years (range 5.0–84.4). At least one complication or surgery was reported for 94.6% and 72.0% of patients, respectively, at a rate of 66.6 and 21.5 events per 100 person-years. Diverse medical and surgical complications were reported for all ages in a bimodal distribution, occurring more frequently in the youngest and oldest age groups. A total of 40 patients had previously undergone limb lengthening (capped at 20% per the study protocol). The most frequent surgery types varied by age, in line with complication profiles. Healthcare resource use was high across all age groups, especially among the youngest and oldest individuals, and did not differ substantially according to history of limb lengthening. Compared to general population values, patients reported impaired QoL particularly for physical functioning domains. In addition, patients reported difficulty carrying out daily activities independently and pain starting in childhood. Patient height correlated with multiple patient-reported outcomes. Conclusions The findings of this study suggest that, across an individual’s lifetime, achondroplasia is associated with multisystem complications, reduced QoL and functionality, and increased pain. These results highlight the large amount of healthcare resources that individuals with achondroplasia require throughout their lifespans and provide novel insights into current achondroplasia management practices across Europe. Trial registration ClinicalTrials.gov, NCT03449368, Submitted 14 December 2017 – prospectively registered, https://clinicaltrials.gov/ct2/show/record/NCT03449368
更多查看译文
关键词
Achondroplasia,Disease burden,Fibroblast growth factor receptor 3 (FGFR3),Natural history,Skeletal dysplasia
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要