Analytical Derivation of Frequency Response Rate Constraint in Distribution System Restoration With Single Master Diesel-Based DG

Dexiang Lai,Chen Chen, Sijia Tang,Zhaohong Bie,Jianhui Wang

IEEE Transactions on Smart Grid(2023)

引用 0|浏览35
暂无评分
摘要
Transient frequency deviation resulting from load pick-up operations is a barrier to DG-based service restoration. The prime mover dynamics and control-parameter configuration have a significant effect on the frequency response rate (FRR) in the restoration process, but have not been sufficiently considered in previous works. To address this issue, this letter analyzes the FRR based on the transfer function of the speed-regulator of a single master diesel generation unit, and simplifies the model through variable substitution and order reduction. A succinct FRR constraint is derived according to the characteristics of the standard Type 2 system. The simulation of the restoration process verifies the accuracy of the derivation.
更多
查看译文
关键词
Diesel generator,distribution service restoration,speed regulator,frequency response rate
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要