Study on Key Technologies of Drilling and Completion of 8000 Meter Ultra Deep Wells in Platform Basin

Hongtao Liu, Xuewen Yang, Chongyuan Zhang,Bo Zhou, Yong Sheng,Li Zhao, Tianbo Wang

Highlights in Science, Engineering and Technology(2022)

Cited 0|Views3
No score
Abstract
In order to solve the problems faced by 8000m class drilling and completion in tarim Basin, such as high temperature, high pressure, complicated formation, low bearing capacity of Permian tuff and development of fractures and pores in basalt segment, etc. Combined with the actual construction situation, has formed the basin area of 8000 m class drilling and well completion key technology optimization results, including optimization of casing program design and matching high crowded outside casing strength, super light corrosion resistance of titanium alloy pipe, under different working condition of the high strength developeded. These technologies, new anti-gas channeling resistance to high temperature high density cement slurry system in sectors such as advanced and practical technology. The successful application of the technology system in the 8000m class drilling in the Platform basin area has greatly boosted the exploration and development process of deep oil and gas resources, and helped improve the competitiveness of the drilling and completion market in China.
More
Translated text
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined