Optimal Project Completion Time, a Multi-Objective Model and Monte Carlo Simulation-Optimization Solution

2019 Industrial & Systems Engineering Conference (ISEC)(2019)

引用 0|浏览2
暂无评分
摘要
In the literature of project scheduling it is very common to assume deterministic durations of project activities. Yet, activities with random durations are possible in many situations. In contrast, crashing activities of construction projects reduces their completion time, but this is achieved at additional charges compared to the normal execution charges. It is very common to penalize late completion of construction projects, yet, some sponsors are willing to reward early completion; for example, due to the opportunity cost involved, an oil company is willing to pay an incentive for fixing an oil pipeline proportional to earliness of project completion time. This paper presents a multi-objective project-scheduling model along with a Monte Carlo simulation optimization solution using a general-purpose simulation software. The model determines the optimal crashing levels of the projects' activities, whose durations are random, to minimize the expected project completion time and to maximize the expected profit of the project.
更多
查看译文
关键词
project scheduling,Monte Carlo simulation,crashing,multi-mode project scheduling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要