Design and First Tests of Five 100 GW Fast LTD Cavities into an E-Beam Diode Load
2007 IEEE 34th International Conference on Plasma Science (ICOPS)(2007)
Abstract
Summary form only given. A module consisting of five 100 GW Fast LTD cavities stacked in series was tested with e-beam diode load to study how a number of cavities behave and add their energy, power and voltage output in a voltage adder configuration assembly. In this report we present the design of the module and diode, and compare test results with simulations.
MoreTranslated text
Key words
fast LTD cavities,e-beam diode load,voltage adder configuration assembly,power 100 GW
AI Read Science
Must-Reading Tree
Example
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined