Reactive power provision using distribution grid resources: flexibility hub use case

CIRED - open access proceedings journal(2021)

引用 0|浏览6
暂无评分
摘要
With the energy transition at sight and the EU renewable energy source integration ambition, the EU-SysFlex project aims at defining a set of advancements in the electric system that drives us towards that direction. With the increasing decentralisation and granularity of the generation facilities, local generation will gain a determinant role in the provision of future local and global systems services. This study presents an overview of a framework for a local market for reactive power control that will be implemented and demonstrated under a real scenario in a Portuguese demo site. The demonstration includes a set of capacitor banks of the distribution system operator (DSO) and two wind farms of a wind power generation operator. This local reactive power market consists of a close to real-time continuous intraday local market managed by the DSO, with 15 min delivery time to increase temporal granularity, and with 7 h delivery horizons with complex bids to allow more flexible assets operation. Market agents can also correct future previously scheduled positions by participating themselves as sellers or buyers of capacitive or inductive reactive power, providing a more flexible framework.
更多
查看译文
关键词
reactive power provision,distribution grid resources,flexibility hub,renewable energy source integration,EU-SysFlex project,local power generation,local power market,reactive power control,Portugal,distribution system operator,capacitor banks,wind farms,wind power generation operator,real-time continuous intraday local market,temporal granularity,delivery horizon,flexible asset operation
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要