Progress of Establishing the China-Indonesia Joint Laboratory on HTGR

Nuclear Engineering and Design(2022)

Cited 3|Views3
No score
Abstract
•The China-Indonesia Joint Laboratory on High Temperature Gas-cooled Reactor was co-established in 2017, designating INET and BATAN as the implementing institutions.•Joint researches include modular HTGR technology, safety and licensing, simulation technology, and localization potentials.•The program of Joint Laboratory sets a good example for future collaborations under the framework of “Belt and Road” initiative.
More
Translated text
Key words
htgr,china-indonesia
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined