Tumor Biochemical Heterogeneity and Cancer Radiochemotherapy: Network Breakdown Zone-Model
ENTROPY(2022)
摘要
Breakdowns of two-zone random networks of the Erdos-Renyi type are investigated. They are used as mathematical models for understanding the incompleteness of the tumor network breakdown under radiochemotherapy, an incompleteness that may result from a tumor's physical and/or chemical heterogeneity. Mathematically, having a reduced node removal probability in the network's inner zone hampers the network's breakdown. The latter is described quantitatively as a function of reduction in the inner zone's removal probability, where the network breakdown is described in terms of the largest remaining clusters and their size distributions. The effects on the efficacy of radiochemotherapy due to the tumor micro-environment (TME)'s chemical make-up, and its heterogeneity, are discussed, with the goal of using such TME chemical heterogeneity imaging to inform precision oncology.
更多查看译文
关键词
hypoxia heterogeneity, tumor radiotherapy, inverse percolation shell model, monte-carlo simulations, oncology radiation modelling, network breakdown
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要