Chrome Extension
WeChat Mini Program
Use on ChatGLM

Prediction Model of Power Grid Project Duration Based on BP Neural Network

Baogang Chen, Jing Mo, Zhanghai He,Qinghe Zeng, Zhilong Weng,Xiangbiao Leng, Haixiang Yu

2022 4th World Symposium on Artificial Intelligence (WSAI)(2022)

Cited 1|Views0
No score
Abstract
With the continuous progress of science and technology, artificial intelligence has emerged and received widespread attention. At present, it has been applied in many fields. In order to realize the prediction of power grid construction project duration, this paper proposes a prediction model of power grid construction project duration based on BP neural network. Firstly, the characteristics of the power grid project are analyzed and the influencing factors that have a great influence on the project duration are summarized. Secondly, according to the construction characteristics of the power grid project, the whole project is divided into several stages, and each stage is subdivided into several processes. Thirdly, according to the construction stage of the power grid project and the division of the process, the number of nodes in each layer of the BP neural network is designed, and the effectiveness of the method is demonstrated by engineering examples. Finally, it is concluded that the model has certain value in the prediction of the duration of the power grid project.
More
Translated text
Key words
power grid project,artificial intelligence algorithm,BP neural network,construction period prediction
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined