Power-based modelling of renewable variability in dispatch models with clustered time periods

Renewable Energy(2022)

引用 0|浏览0
暂无评分
摘要
The planning of future power systems with high shares of renewable generation requires modelling large and complex systems over long time periods, resulting in models which are computationally heavy to solve. For this reason methods that can be used to decrease the size of power system dispatch models are needed. A common method in large scale planning models is to decrease the model size by increasing the size of the time steps. However, using larger time steps makes the representation of variability of renewable generation and load less accurate, which can affect the results from the model. In this paper, we investigate the possibility to use a power-based version of an economic dispatch model to decrease the model time resolution while getting results which are close to the original high-resolution model. We implement both power-based and the conventional, energy-based, versions of a dispatch model with different time resolutions, and show that the power-based model has better agreement with the high-resolution model, especially as the model time step increases. For example, using the power-based model gives more accurate results for wind power curtailment in a high-renewable scenario. (c) 2022 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
更多
查看译文
关键词
Economic dispatch, Power system planning, Hydro power planning, Renewable generation, Power-based model
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要