Treatment of Water Gushing in Working Shaft for Pipe Jacking Construction in Jinjiang Tunnel of Second West to East Gas Pipeline Project

Yang Chun-lin,Liu Jia-chang

Petroleum Engineering Construction(2013)

Cited 0|Views0
No score
Abstract
This article introduces the design scheme of water sealing in the working shaft for pipe jacking construction in Jinjiang Tunnel of the Second West to East Gas Pipeline Project,the cause analysis of water gushing happened in the working shaft during construction and the treatment scheme.The method of applying water barrier of high-pressure rotary jet grouting piles combined with drilling grouting is taken to stop the water gushing under complex stratum conditions,and gains satisfactory effect of smooth construction progress.
More
Translated text
Key words
water gushing,pipe jacking construction,east gas pipeline project,jinjiang tunnel
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined