Engineering practice of surface grouting treatment through soft surrounding rock stratum by TBM

IOP Conference Series: Earth and Environmental Science(2018)

引用 0|浏览0
暂无评分
摘要
When the TBM passes through the weak and broken strata, it is easy to get stuck and be buried. Through the advance pre grouting engineering practice of TBM crossing fault zone in Qingdao area, the pre grouting reinforcement measures for preventing the occurrence of TBM card machine are explored, including grouting pressure, grouting drilling design, grouting material and other key parameters. The research results show that the surface pre grouting method is an effective grouting measure to prevent the occurrence of TBM stuck and buried accidents. Single cement slurry and C-S double slurry are used as grouting materials. The cement slurry is used to fill the void in soft broken stratum and C-S double slurry is used to improve the controllability of slurry diffusion. In the process of advanced pre-grouting construction on the ground surface, the application of progressive segmental grouting technology and membrane bag sealing grouting technology can effectively guarantee the strengthening range of soft ground and improve the effect of grouting reinforcement.
更多
查看译文
关键词
rock stratum
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要