Discussion on Integrated Design of Emergency Storage Facilities for Dangerous Chemicals Transportation Accidents and Bridge Drainage Run off Treatment Facilities of Expressway
E3S Web of Conferences(2020)
摘要
Based on the investigation on the collection and treatment of the runoff from the bridge-deck of some expressways involving sensitive water bodies, this paper proposed an integrated design idea of the emergency storage facility and the bridge-deck rainwater runoff treatment facility for the transportation accident of dangerous chemicals in the expressway. The integrated design idea improves the disadvantages of simultaneous treatment of rainwater and accident-water in the bridge-deck runoff treatment system. The process flow, plane layout, functional unit volume design, conversion device, and control system involved in the integrated design are discussed.
更多查看译文
关键词
Emergency Capability
AI 理解论文
溯源树
样例
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要