Chrome Extension
WeChat Mini Program
Use on ChatGLM

BIM Role within the Conceptual Design Phase: A Case Study of a UK Construction Project

International Journal of Architecture, Engineering and Construction(2019)

Cited 1|Views0
No score
Abstract
he application of building information modelling (BIM) during the construction cycle of any development varies. Systematically, the way BIM’s applied during the initial phase will have a direct influence on phases that follow afterwards. Previous research focused on the application of BIM and concentrated on various aspects, which included sustainability or how to overcome the loss of data/information. However, it limited its focus on the application during a specific phase of the project. Analysis outlined both the benefits and barriers of applying BIM during the conceptual design phase. The study suggests that an informed evaluation of the application of BIM during any particular phase should take in consideration different stakeholders’ roles and responsibilities.
More
Translated text
Key words
conceptual design phase,conceptual design,uk construction project
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined