The impact of payload truck factor use in mine performance reports for an open pit copper mine in Brazil

REM - International Engineering Journal(2018)

引用 2|浏览0
暂无评分
摘要
Abstract This article aims to evaluate the use of a truck factor for off-highway trucks in open pit mine operations, thus reducing error on material movement and mine production data entry. This method is current for a copper mine located in South East Pará, Brazil. With a dispatch system, the truck factor is calculated using three data inputs called measured t, dump t and excavator load time. This dispatch system, designed to upload real time data from each truck, acquires measured load information by a truck weightometer and provides the basis for long-term, medium-term and mainly short-term planning. Due to the significant impacts toward mine planning, through data error, a payload truck factor system provides data assurances in place of potential failure of onboard weighing. However, when using a system that is reliant on actual data, caution must be applied when replacing information with assumed fixed figures, thus forming the discussion on which this article attempts to review by providing overview on both the positive and negative impacts of implementing a truck factor system to an open pit mining using a dispatch system.
更多
查看译文
关键词
truck factor,average load,production
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要