Development of a procedure for determining the pre-failure condition of the axle boxes of railway rolling stock
Communications - Scientific letters of the University of Zilina(2021)
Abstract
Resume It has been determined that the greatest risk of an error in determining the technical condition of the axle box unit in the so-called "zone of uncertainty" is in the impossibility of unambiguously assessing its technical condition. To solve this problem, a model is proposed in the form of an n-dimensional radius vector, which has a direction towards an increase in the probability of failure and a deterioration in its parameters' values. Such a model for determining the axle box unit's pre-failure condition will reduce the risk of errors in decision-making. Article info Received 26 May 2020 Accepted 8 June 2021 Online 16 November 2021
MoreTranslated text
Key words
axle box unit,control of technical condition,built-in control,ambiguity area,pre-failure condition,radius vector
AI Read Science
Must-Reading Tree
Example
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined