Winter Forage Crop Harvest Time Impacts Regeneration of the Annual Weeds Barley Grass, Annual Ryegrass and Wild Radish
AGRONOMY-BASEL(2021)
Abstract
Barley grass (Hordeum spp.) is a short-lived annual weed which competes with preferred crop and pasture species and frequently contaminates wool and carcasses, and irritates the ears, eyes and noses of sheep. Barley grass, annual ryegrass (Lolium rigidum L.) and wild radish (Raphanus raphanistrum L.) are annual winter crop weeds which reduce grain yield through competition. In three consecutive years (2015 to 2017) cereal, legume and cereal/legume forage crops were grown and harvested in early October, late October or early November consistent with an early silage harvest (ES), late silage harvest (LS) or hay cut (H). A spring wheat cultivar was sown over each site in the following year (2016 to 2018). Weed density was recorded during the forage crop and wheat phases. Forage crop weed populations varied between years. Late paddock preparation for sowing in 2015 effectively eradicated barley grass from all forage crops; however, the competitiveness of legume and cereal/legume crops against annual ryegrass was reduced. In contrast, legume and cereal/legume mixtures tended to have higher barley grass densities than cereal crops in 2016 and 2017, when paddock preparation was earlier. Cutting in October 2015 reduced annual ryegrass and wild radish populations in 2016 wheat by 92.0% and 86.7%, respectively. In 2017 and 2018, regrowth and subsequent seed set following cutting appeared to negate cutting time effects for all crop and crop/legume combinations. Late paddock preparation, an early October forage harvest and effective regrowth control provided the best opportunity for barley grass, annual ryegrass and wild radish control in a single year.
MoreTranslated text
Key words
winter crop,forage crop,weed control,hay,silage,fodder conservation
AI Read Science
Must-Reading Tree
Example
![](https://originalfileserver.aminer.cn/sys/aminer/pubs/mrt_preview.jpeg)
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined