Construction And Application Of Scheduling Model Of Power Grid Infrastructure Project Based On Delegate Power And Optimize Service Policy

2020 6TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING(2020)

引用 0|浏览2
暂无评分
摘要
In order to adapt to the reform of transmission and distribution price, implement the company's requirements of the policy of Delegate Power and Optimize Service, realize the precise investment of power grid and help the high quality development of power grid. It is urgent to explore a scientific and effective method of project schedule, assist the grid investment decision-making, and improve the level of investment plan management.
更多
查看译文
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要