Hvac Operation Schemes And Commissioning Process Resolving Stack Effect Problem And Adjusting According To Changes In The Environment: A Case Study In High-Rise Building In South Korea

ENERGIES(2021)

引用 4|浏览1
暂无评分
摘要
Various problems often arise in high-rise buildings during the winter months due to the stack effect. In this study, the high-rise building of interest, located in South Korea, was experiencing constant loud noises in the winter due to the stack effect. Thus, we created a noise level reduction plan by creating a method for pressurizing the high-rise zones of the building according to outdoor conditions. To discover the appropriate pressurization operating modes, we applied a two-year commissioning process to the 50-story building of interest. The 1st- and 47th-floor elevator halls were identified to have the highest noise levels of all other floors. Prior to applying the reduction plan, the maximum noise level on the first floor with the HVAC system turned off was 85 dB(A) and with the HVAC system turned on it was 70 dB(A). Both values exceeded the criteria of 57 dB(A) for a lobby space of a commercial building. In the case of the 47th floor, the maximum noise level with the HVAC system turned off was 58.7 dB(A) and with the HVAC system turned off was 56.0 dB(A), despite the latter having increased airtightness performance and applying preliminary pressurization (i.e., HVAC operation mode 2). These values exceeded the criteria of 48 dB(A) for an elevator hall in a commercial building. Following this initial data, we determined to pressurize the high/mid-rise zones of the building according to the outdoor air temperature and wind velocity conditions, which we categorized into four types (i.e., HVAC operation mode 4). To this effect, the first-floor elevator hall's maximum noise level was 56.6 dB(A), meeting the criteria, and the 47th-floor elevator hall's maximum noise level was 49.5 dB(A), still exceeding the criteria but by an insignificant amount. Although the HVAC pressurization operation we utilized resulted in favorable results for the target building A, it may not be as effective in other new high-rise buildings, creating changes to the indoor air environment or to the energy costs in maintaining a building. However, for the purposes of resolving the stack effect, we believe that the commissioning process we took to optimize the HVAC operation that is presented here can be applied to other new and existing high-rise commercial buildings.
更多
查看译文
关键词
high-rise buildings, stack effect, HVAC pressurization, commissioning process, outdoor conditions
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要