Chrome Extension
WeChat Mini Program
Use on ChatGLM

Alignment strategy for IFMIF-DONES facility

Fernando Arranz, Santiago Becerril,Davide Bernardi,Tamas Dezsi, Javier Gutierrez, Mario Garcia,Jorge Maestre,Ivan Podadera, Cayetano Prieto,Urszula Wiacek,Daniel Sanchez-Herranz, David Beltran

FUSION ENGINEERING AND DESIGN(2024)

Cited 0|Views10
No score
Abstract
This article addresses the challenges associated with the alignment of the equipment within the IFMIF DONES installation and presents the strategy devised to achieve acceptable levels of uncertainty. The primary obstacles stem from the need to align equipment located in different rooms, some of which are inaccessible for manual operations. Additionally, the elevated radiation levels in certain areas impose restrictions on the fiducials that can be employed. The article details the outcomes of implementing the proposed alignment procedure, including the specific equipment used and the achieved levels of uncertainty.
More
Translated text
Key words
DEMO oriented neutron source,IFMIF-DONES,Alignment
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined