Ordered weighted evaluation method of lifting operation safety risks considering coupling effect

Kesheng Yan,Lianghai Jin, Xiaoyun Yu

Scientific Reports(2024)

Cited 0|Views2
No score
Abstract
In order to accurately evaluate the safety risk degree of lifting operations and improve the safety control level of lifting operations, firstly, Work Breakdown Structure (WBS) is used to decompose the construction process of lifting operations, Risk Breakdown Structure (RBS) is used to decompose the safety risk, 16 safety risk factors of lifting operations are identified, and the risk evaluation system is constructed. Then, the safety risk assessment model of lifting operations is constructed by integrating risk coupling theory, joint ordered weighting operators, and an interaction matrix to identify key risk factors and safety risk levels. Finally, taking the lifting operation construction project of Yangfanggou Hydropower Station as an example, the evaluation index system and method are applied. The results show that the high-risk safety risks of the lifting operation construction of the project are: 'Low safety awareness causes workers to operate illegally X 23 ', 'Operation error caused by illegal command X 33 ', 'Workers' risky work caused by low safety awareness X 34 ', 'Edge, high and climbing operation protection is not in place X 36 ', and 'Improper binding of components caused by workers' illegal operation X 25 '. The construction of the lifting operation poses a significant risk level, and the evaluation results are consistent with the actual situation. The rationality of the evaluation system and model constructed in this paper can provide a reference for the safety management and control of the construction site of the lifting operation and the safety of the lifting operation.
More
Translated text
Key words
Lifting operation,Safety risk,Coupling effect,Interaction matrix,Joint ordered weighted operator
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined