500 kV综自变电站改扩建间隔层水平通讯问题分析及改进措施
Electric Power System Equipment(2020)
Abstract
本文介绍了500 kV综自变电站改扩建工程中,因进口测控装置与国产测控装置通讯不匹配,导致间隔层水平通讯异常,间隔层五防联闭锁功能缺失案例,并提出了应对措施,对传统变电站进口自动化设备国产化改造具有一定的借鉴意义.