谷歌Chrome浏览器插件
订阅小程序
在清言上使用

Initial Results Of Enel Green Power Silicon Heterojunction Factory And Strategies For Improvements

2020 47TH IEEE PHOTOVOLTAIC SPECIALISTS CONFERENCE (PVSC)(2020)

引用 4|浏览5
暂无评分
摘要
This paper reports on the first months of operation of the silicon heterojunction production line at Enel Green Power which started in April 2019 as well as strategies for efficiency improvement. The efficiency of the lines reached in short time is demonstrated in its current configuration with 4BB cell design. Within the collaboration with CEA, an intense activity is ongoing to increase the module efficiency. For the time being, it has been demonstrated a new European HJT cell record certified at 24.63% on a full M2 wafer.
更多
查看译文
关键词
heterojunction, silicon solar cells, production line
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要