Train Scheduling Method To Reduce Substation Energy Consumption And Peak Power Of Metro Transit Systems

TRANSPORTATION RESEARCH RECORD(2021)

Cited 3|Views2
No score
Abstract
The rapid development of metro transit systems brings very significant energy consumption, and the high service frequency of metro trains increases the peak power requirement, which affects the operation of systems. Train scheduling optimization is an effective method to reduce energy consumption and substation peak power by adjusting timetable parameters. This paper proposes a train timetable optimization model to coordinate the operation of trains. The overlap time between accelerating and braking phases is maximized to improve the utilization of regenerative braking energy (RBE). Meanwhile, the overlap time between accelerating phases is minimized to reduce the substation peak power. In addition, the timetable optimization model is rebuilt into a mixed integer linear programming model by introducing logical and auxiliary variables, which can be solved by related solvers effectively. Case studies based on one of Guangzhou Metro Lines indicate that, for all-day operation, the utilization of RBE would likely be improved on the order of 23%, the substation energy consumption would likely be reduced on the order of 14%, and the duration of substation peak power would likely be reduced on the order of 66%.
More
Translated text
Key words
Train Scheduling,Railway Timetabling,Rescheduling Algorithms,Transit Network Design,Energy Efficiency
AI Read Science
Must-Reading Tree
Example
Generate MRT to find the research sequence of this paper
Chat Paper
Summary is being generated by the instructions you defined